Money Control Place
  • Politics
  • Business
  • Stocks
  • Investing
  • Politics
  • Business
  • Stocks
  • Investing

Money Control Place

Investing

Commissioning Proceeding to Plan as Boss Prepares for First Sales

by May 8, 2024
May 8, 2024
Commissioning Proceeding to Plan as Boss Prepares for First Sales

Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to advise that the commissioning process at its Honeymoon uranium project is proceeding to plan, with key metrics exceeding feasibility study forecasts.

Highlights

Commissioning process advancing well, with key metrics ahead of feasibility study (FS) estimates, including:Wellfields averaging 80 – 100mg/L vs FS estimate of 47mg/L (~100% uplift)Ion Exchange loaded resin recoverability is virtually 100%Resin loading averaging 36g/L vs FS estimate of 27 g/L (~33% uplift)Elution performance > 7g/L vs a targeted range of 3 – 5 g/LFirst uranium sale is expected to occur in July with cash to be received in Q3 2024Boss remains highly leveraged to rising uranium price, with sales contracts covering just 1.8Mlbs over eight years

This outperformance is reflected in results of the uranium-rich Pregnant Leach Solution (PLS) from the wellfields, IX column resin loading and high grade IX column eluate.

The focus is now on optimisation of the ion exchange, elution and precipitation processes to achieve continuous operations.

Production update

Tenors from the individual wellfields into the PLS are averaging 80 – 100 mg/L. Honeymoon’s feasibility study assumed PLS grade of 47 mg/L based on results from the project’s previous operation.

The lixiviant chemistry, as proved during the field leach trial, is now demonstrating superior performance at commercial throughput rates. The increased leach efficiency leads to a more efficient loading on the ion exchange resin, effectively lowering operating costs as less reagents and power are required per drum of uranium.

A critical factor in resin performance is the actual loading of uranium from the PLS onto the ion exchange resin. Demonstrated loading rates of up to 36g/L are 33% higher than feasibility estimates. This means Honeymoon’s ion exchange circuit is currently making more uranium per cycle than designed. The cost of processing a cycle of ion exchange resin is fixed, which means that higher resin loading will drive a more efficient use of reagents.

Stripping of uranium from the loaded resin is virtually 100%, also demonstrating that the ion exchange process is working as designed, resulting in a high grade concentrated eluate greater than 7g/L.

First Sale of Product

Boss has sought from the outset to align its production strategy and timetable with the global uranium market, maximising its ability to capitalise on favourable supply and demand fundamentals.

As at 31 March 2024, Boss had ~$300m in liquid assets, no debt and diversity of supply with no jurisdictional risk. This strong balance sheet has provided Boss with flexibility to choose when it enters into contracts and to select pricing mechanisms which maximise our exposure to market upside while limiting risk in softer market conditions.

To date, Boss has entered into two binding sales agreement to sell 1.8Mlbs U308 to major European / US power utilities over eight years from 2024 to 2032. The Company intends to enter into further as the uranium price rises.

Boss’s contracting strategy is to monitor the markets and layer in contracts, predominantly market related, to optimise future pricing and, in the near term, to ensure profitability and cash flow as production ramps up. First delivery into these contracts is planned to occur in July 2024 with payment expected in that quarter.

Boss Managing Director Duncan Craib said: “We are very pleased with the commissioning progress to date. We are meeting or exceeding key feasibility study forecasts and the processing technology is performing as our extensive testwork showed it would.

“These early production results provide confidence that we are on-track to meet our ramp up targets. Ramp-up timing has been designed to align with a rising uranium market. We believe we will be hitting our straps as the uranium price rises in the near term”.

Click here for the full ASX Release

This article includes content from Boss Energy Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
This post appeared first on investingnews.com
0
FacebookTwitterGoogle +Pinterest
previous post
E25 Secures USA Site for HPMSM Refinery
next post
Rio Silver Commences Baseline Environmental Studies

Related Posts

Finlay Minerals Appoints an Executive Chairman, President &...

May 12, 2025

Hydrology Drilling to Support Scoping Study Commenced

January 17, 2025

Graphite Market Update: H1 2023 in Review

July 19, 2023

Crypto Market Review: Trump Media Planning US$3 Billion...

May 27, 2025

Sranan Gold Announces Investor Webinar on Exploration Activities...

July 15, 2025

Apollo Silver Announces Upsize of Private Placement Offering

October 4, 2025

Nano One Announces Collaboration Agreement with Sumitomo Metal...

September 26, 2023

Mernova’s Strong Progress Continues

May 9, 2024

Peter Schiff: Gold, Silver Correction Over? Next Price...

November 13, 2025

Is Now a Good Time to Invest in...

October 4, 2023

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Latest

    • S&P 500 Breaking Out Again: What This Means for Your Portfolio

    • 10 Silver ETFs for Every Investing Style in 2025

    • Humanoid Robotics: Key Trends to Watch and Investment Insights

    • Why SQM Says Social Dialogue is Key to Sustainable Lithium

    • Group Eleven Drills New Mineralized Zone South of Main Discovery Trend at Ballywire, Returning 7.3m of 5.2% Zn+Pb, 10 g/t Ag , Incl. 3.8m of 7.3% Zn+Pb, 14 g/t Ag

    • Blackrock Silver Announces Final Assays from Eastern Expansion Drill Program at Tonopah West

    Categories

    • Business (1,418)
    • Investing (3,224)
    • Politics (3,699)
    • Stocks (1,868)
    • Uncategorized (20)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: MoneyControlPlace.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 moneycontrolplace.com | All Rights Reserved